|
080607 010 (Medium)
a whole pile of legs
woo hoo!
Date: 08/12/2007
Views: 267
|
080507 024 (Medium)
looks great assembled
Date: 08/05/2007
Views: 261
|
080607 009 (Medium)
another r2 and legs picture
Date: 08/12/2007
Views: 222
|
|
080607 002 (Medium)
the prototypes from the welding shop ,these were built to prove the jig,
Date: 08/12/2007
Views: 255
|
080607 002 (Medium)
prototype legs include shoulder shims
Date: 08/12/2007
Views: 239
|
080607 013 (Medium)
thes have a window open by the ankle area that will not effect standard building
Date: 08/12/2007
Views: 219
|
|
080607 011 (Medium)
only bad thing- the shop mistakenly welded in the under arm openings... no big deal,it can be cleaned
Date: 08/12/2007
Views: 251
|
080607 013 (Medium)
six hole patern is NEW standard for assembly to the ankles
Date: 08/12/2007
Views: 227
|
|